Date | Construction | Location | Technical description | Area of strengthening | The client |
30.07.2004 - 01.09.2004 | Shopping centre Tesco in Kalisz | Kalisz | Soil compaction with the dynamic compacting (tamping) method. | 10 277 m2 | BUDIMEX - DROMEX Warsaw |
15.09.2004 - 20.03.2005 | A-2 highway site Koło-Dabie | Koscielec | Construction of gravel columns in non-bearing soil | 8 263 lm | STRABAG Warsaw |
01.09.2005 – 22.11.2005 | Ring road around Dobrodzień | Dobrodzien | Soil strengthening with gravel columns. | 25 000 m3 | BUDIMEX - DROMEX Warszawa |
10.10.2005 - 20.12.2005 | Ring road around Sulechów | Sulechow/ Zielona Gora | Soil strengthening with gravel columns. | 34 712 m3 | STRABAG Warsaw |
2006 | Border crossing point Świnoujście - Garz | Świnoujście | Soil strengthening with gravel columns. | 60 000 m3 | POLIMEX MOSTOSTAL Siedlce S.A. |
2006 | Siekierkowski Route in Warsaw | Warsaw | Soil strengthening with gravel columns. | 15 104 m2 | Budimex Dromex |
05-12.2006 | The ring road around Lubsko | Lubsko | Soil strengthening with gravel columns. | 16 151 m2 | PRD Lubartow S.A. |
09.2006-07.2007 | Motorcar factory of MAN trucks in Niepolomice | Niepolomice | Soil strengthening with gravel columns and geosynthetic reinforced base (110 000 m2). | 11 000 lm of columns | BILFINGER BERGER Infrastruktura Sp. z o.o. |
2007 | A1 Motorway section Sośnica - Bełk | Knurów | Construction of gravel columns and soil strengthening with dynamic tamping (10 940 m 2). | 51 302 lm of columns | J&P AVAX S.A. |
09.2007-04.2008 | A1 Motorway section Kraków - Szarów | Kraków | Soil strengthening with gravel columns | 19 794 lm | Consortium Dragados - Polimex-Mostostsl |
09.2007 - 04.2008 | A1 Motorway | Warlubie | Soil strengthening with gravel columns | 3 080 lm | SKANSKA S.A. |
09.2007-07.2008 | The ring road around Gostynin | Gostynin | Soil strengthening with gravel columns. | 4 595 lm | Mazowiecki Zarząd Dróg Wojewódzkich w Warszawie |
05.2008-02.2009 | A1 Motorway site Gorzyczki-Świerklany | Gorzyczki-Świerklany | Construction of gravel columns and soil strengthening with dynamic tamping (24 052 m2) | 8 746 lm of columns | Consortium ALPINE |
Date | Construction | Location | Technical description | Area of strengthening | The client |
04.2001 | Oil and fuel intermediate pump station | Gora near Inowroclaw | Jet grouting piles for spot footing and foundations of pumps Ø 800 mm | 480 lm | INTECH - METAL Sp z o.o. |
07.2001 – 08.2001 | Apartment building | Bóżnicza l street in Poznań | Jet grouting piles under the building’s foundations Ø 600 mm | 1 400 lm | HYDROBUDOWA 9 Poznan |
09.2001 | The bridge on the Lyna river | Dobre Miasto | Strengthening of bridge heads and bridge pillars, jet grouting piles Ø 600 mm | 285 lm | HEILIT+WOERNER Budowlana Ltd. Warsaw |
10.2001 | Overpass in Bytow | Bytow | Construction of a 100 cm wide baffle of jet grouting piles for heads of the overpass and construction of overpass abutments | 2 050 m3 | MOSTY PŁOCKIE S.A. Branch in Gdansk |
09.2002- 12.2003 | A-4 highway site, from Wirek interchange to Batory interchange | Ruda Slaska | Soil strengthening under embankments and overpasses with jet grouting columns Ø 600mm and 800mm including 11 933 lm of reinforced piles with HEB-200 profile to the depth of 20m. Sealing of the bottom of the excavation under culvert by means of jet grouting | 43 326 lm | P.R.Inż. HOLDING S.A. Katowice |
16.08.2004 - 10.10.2004 | Shopping Centre 'Dabrowka' | Zielona Gora | Protection of excavation faces with reinforced jet grouting columns | 3 900 lm | BUDIMEX - DROMEX Warsaw |
01.07.2004 - 15.07.2005 | Transit route in Włocławek –construction of Queen Jadwiga Avenue | Wloclawek | Soil strengthening under tunnels C-1 and C-2 with jet grouting columns Ø 800 mm | 3 799 lm | NECSO Warsaw |
01.09.2005 -22.11.2005 | Dobrodzien ring road | Dobrodzien | Jet grouting piles | 740 lm | Budimex Dromex |
2006 | Building, Polwiejska street, Poznan | Poznan | Reinforcement of foundations with jet grouting columns | 615 lm | PEKABUD - MORASKO Poznan |
2006 | Bridge in Krosno | Orneta | Jet grouting columns reinforced with steel pipe 76/8 for bridge pillars foundations | 210 lm | STRABAG Warsaw |
2006 | Overpass in Dolna Wilda | Poznan | Jet grouting piles | 115 lm | Przedsiębiorstwo Robót Komunikacyjnych S.A. Poznan |
2006 | City library in Gorzów Wlkp. | Gorzów Wlkp. | Jet grouting piles Ø 800 mm | 1 753 lm | SKANSKA S.A. |
12.2006- 01.2007 | Chemical Plant in Inowroclaw | Inowroclaw | Jet grouting piles Ø 1200 mm reinforced with 406/12mm pipe and piles Ø 1200 mm reinforced with HEB200 | 1 136 lm | Soda Matwy Ciech |
08.2006- 07.2007 | Motorcar factory of MAN trucks in Niepolomice | Niepolomice | Jet grouting piles | 4 800 lm | BILFINGER BERGER Infrastruktura Ltd. |
04.2007-02.2008 | Franowo overpass | Poznań | Jet grouting piles Ø500mm and Ø 450mm reinforced with I 120 profiles | 7 920 lm | PUT INTERCOR Sp. z o.o. |
2007 | Intercepting sewer, Północna street | Poznań | Jet grouting pilesg | 282 m3 | HYDROBUDOWA 9 |
05.2007 | Tetmajera street | Gdynia | Strengthening of a slope with jet grouting reinforced piles Ø 800mm | 214 lm | Przedsiębiorstwo Wielobranzowe ELGRUNT |
05.2007 | 3/4 Za Grobla street | Poznan | Jet grouting piles | 1 750 lm | Fernandes & Soares Polska Sp. z o.o. |
06.-08.2007 | ALFA Shopping Centre, Swiętojanska street | Bialystok | Jet grouting piles | 720 lm | A-JWK Management Sp. z o.o. |
2007 | Rafinery "LOTOS" | Gdańsk | Strengthening of foundations with jet grouting piles Ø 800mm | 1 396 lm | PRZEMBUD GDANSK S.A |
10.2007 | Górczynski overpass | Poznan | Jet grouting piles Ø 800mm reinforced with HEB200 | 280 lm | PUT INCERCOR Sp. z o.o. |
6.2007-09.2008 | Poznanski railway interchange, railway road E20 | Swarzedz | Reinforced jet grouting columns for baffle boards foundations | 2 200 lm | FEROCO S.A. Poznan |
2008 | Apartment building "Willa Wierzbowa II" | Poznan | Jet grouting piles Ø 800mm and 900mm reinforced with HEB160 | 1 400 lm | Fernandes & Soares Polska Sp. z o.o. |
04-07.2008 | Apartment building Grobla Sw. Jerzego street | Elblag | Jet grouting piles reinforced with HEB200 | 1 329 lm | Consoil Project Sp. z o.o. |
07-08.2008 | Chicken farm in Krzywe Koło | Krzywe Koło near Tczew | Jet grouting piles reinforced with IPE120 and regular jet grouting piles | 1 056 lm and 884 lm | JDA Produkcja Działy Specjalne S.C. |
08.2008 | Cegielski's Diesel Engines Factory | Poznan | Jet grouting piles Ø 800mm reinforced with HEB300 | 220 lm | Przedsiębiorstwo Wielobranżowe HAN-BUD Poznan |
11-12.2008 | Extension of St. Family's Hospital | Warsaw | Strengthening of foundations with jet grouting piles Ø 1000mm | 230 lm | Budwug Sp. z o.o. |
01.2009 | Modernization of City Amphitheatre | Swinoujscie | Jet grouting piles | 470 lm | Polimex-Mostostal S.A. |
12. 2009 -01.2010 | Shopping Centre 'Fokus' | Zielona Góra | Strengthening of foundations with jet grouting palisade Ø600 mm, reinforced with HEA 260 (624,0 lm) and regular jet grouting piles(144,0 lm) | 768 lm | Metal Serwis Sp. z o.o. |
01.2010 | Konstytucji 3 Maja street | Iława | Strengthening of a slope with jet grouting reinforced piles Ø 1000mm | 465 lm | BUDROMOST Sp. z o.o. |
01.2010 | BMW cars showroom | Szczecin | Jet grouting piles Ø400 mm and Ø 600 mm reinforced with IPE 100 and IPE 120 | 1239 lm | Bońkowscy Sp. z o.o. & Spółka Komandytowa |
08.2008-03.2010 | Express road S8, Konotopa interchange to Prymasa Tysiaclecia interchange | Warsaw | Jet grouting horizontal containment barrier that seals and protects the bottom of the trench from displacement | 108 767 m3 | Mostostal Warszawa S.A. |
04.2010 | National road 62, Al.Królowej Jadwigi | Wloclawek | Jet grouting columns reinforced with pipe 168, 2/8 and regular columns | 615 mb | MOSTOSTAL Warszawa S.A. |
04-05.2010 | Apartment building Water Lane, 4 Szafarnia street | Gdansk | Sealing of existing CFA columns palisade and constructing of jet grouting containment barriers (horizontal and vertical) | vertical barriers 1157 mb, horizontal barriers 655 m3 | Hochtief, Branch in Gdansk |